Optimization of the Job Shop Scheduling Problem in Industry 4.0

0.0/5 rating (0 votes)
  • Last update: 10 June 2022
  • File size: 1.54 MB
  • Downloaded: 120
  • Author: Ristić Olga, Milošević Marjan, Milunović-Koprivica Sandra, Vesković Milan, Aleksić Veljko